What is an average time for a bath remodel (add a sink, install a new shower, no tub)? Thank you in advance.?

更新:

plus new tile in shower and on floor (total room is about 15x6)

3 個解答

相關度
  • ?
    Lv 7
    4 年前

    it's been 8 weeks, because not every day is a work day. slow, long, painful. should have determined more 'end' dates. demolition was one day, then an electrician started and walked off the job, etc.

  • Robin
    Lv 7
    4 年前

    one day

  • 4 年前

    3 or 4 days. The longest part is allowing for the waterproofing to set properly