Yahoo 知識+ 將於 2021 年 5 月 4 日 (美國東岸時間) 停止服務,而 Yahoo 知識+ 網站現已轉為僅限瀏覽模式。其他 Yahoo 資產或服務,或你的 Yahoo 帳戶將不會有任何變更。你可以在此服務中心網頁進一步了解 Yahoo 知識+ 停止服務的事宜,以及了解如何下載你的資料。
Bathroom supplementary earth bonding, notifiable?
Is supplementary earth bonding in a bathroom a notifiable work, or can I, as a competent but unregistered, do the work myself? (I'm in the UK)
I know that Part P does list supplementary (and main) bonding as work that does not require notification, but I'm not sure how it being in the bathroom may affect this (seeing as it's a "special" area).
RE: Pauline. It says "addition or alteration to existing circuits", though. Does earth bonding really count as an addition or alteration to a circuit, considering the fact that it's just and earth cable and therefore not live?
2 個解答
- PaulineLv 77 年前最愛解答
Only notifiable if within 600mm of bathtub or shower tray (& less than 2.1m above )
http://www.planningportal.gov.uk/uploads/br/BR_PDF...
And that is supplementary equipotential bonding..